84ºF

Stretch of I-94 to be rebuilt from Conner to I-96

MDOT gets approval

DETROIT – A massive wave of road construction in Metro Detroit is far from over -- it’s time to redo I-94.

Michigan Department of Transportation (MDOT) officially has the go ahead to rebuild both directions of I-94 from Conner Street to I-96.

Construction is expected to get underway in 2023.

Watch the video above for the full report


About the Authors: